Public Utilities should be on Public Land
Mountain States Transmission Intertie – Quick Facts
Northwestern Energy, a South Dakota company, submitted an application under the Montana Major Facility Siting Act with the Montana Department of Environmental Quality. The draft Environmental Impact Statement is expected in September 2010.
The application can be found at www.deq.mt.gov/MFS/MSTIindex.asp
The draft is available
Maps can be found at www.deq.mt.gov - click on the MSTI project and select interactive maps.
Citizen Groups
Move MSTI ~ www.movemsti.com
Save Scenic Jefferson County ~ www.SaveScenicJV.org
Concerned Citizens of Montana ~ www.concernedcitizensMontana.net
Stop the Grid ~ www.stopthegrid.org
Keep It Rural, Southwest Montana ~ www.keepitrural.net
Citizen Concerns:
Lack of notification to landowners and other residents about the project and its proposed routes
Health effects from the Electromagnetic Fields (EMFs)
Loss of property use from physical structures, maintenance roads, right-of-ways
Devaluation of Property Values
Violation of Property Rights, especially related to use of Eminent Domain for this project
Visual impacts
All MT generated electrical power will be shipped out of state to NV and CA
Noxious weeds
Fighting fires under these lines is dangerous and life threatening, fire prevention is hazardous
Emergency communication systems do not work around these lines
Possibility of more high voltage transmission lines through our area
Why is Northwestern Energy’s industry more important than local industry? (ie Ranching)
Why do NWE’s rights outweigh citizen’s rights? And private property rights?
Who does the Montana Major Facility Siting Act protect – Montanans or out-of- state interests?
NWE takes an easement through private property (eminent domain) and we still pay the property taxes.
The siting submitted in NWE application does not include three distinctly different alternative routes.
Alternative routes are sited on hundreds of acres of private property: residential, subdivisions, grazing land, hay ground.
Physical structures do NOT provide any shielding from magnetic fields
EMF s interfere with pacemakers, defibrillators, radio, television, cordless phones, cell phones
Aviation interference
Apiaries: Electrical fields have been shown to cause bees to leave their hives (NWE required to notify within 1000 feet of the hives – owners would need to move the hives!)
Loud noise generation
Possible bright strobe lights
Chronic fatigue, heart problems, headaches, Immune system suppression, Leukemia, brain tumors, birth defects, miscarriages, prostate and breast cancer
Reported spontaneous abortion, reduced milk production, low birth rates, death
Operational Impacts
Operation would permanently convert agricultural land to non-agricultural use
- Impacts to cropland and rangeland would occur due to access roads and structures
- Permanent loss of agricultural land i.e. Grazing, hay ground, farm, irrigation systems and irrigated crop lands
Operation would permanently interfere with active agricultural operations
- Dividing or fragmenting agricultural fields, obstructing access, impeding the delivery and use of water for livestock and irrigation, reducing the efficacy of windbreaks, and disrupting the operation of farm equipment
- Aerial spraying for noxious weeds, insects and crop diseases becomes hazardous
FHA Rules prohibit the issuance of insured loans for homes located adjacent to transmission power lines. (12 - 60 kV or greater, as they are considered hazardous) FHA Rules 1912 4150.2-2J
Range – 220 feet (110 from center) to 409 feet depending on EMF fields
MFSA criteria: EMFs are not to exceed 1000 volts/m at edge of ROW so NWE solution to stay within “safe” levels is to just extend the ROW
EMFs generated within the ROW range from 13,000 to 1,500 volts/m
Guyed V steel lattice, Single Circuits structures: all 125 feet tall. Double Circuit: 185 feet tall.
Land area permanently disturbed per structure: 22,500 sq. feet (.52 acres)
4 to 6 structures built per mile
Permanent loss of property due to structures along with acreage within the ROW from unsafe levels of EMFs
Construction of access/maintenance roads – 20 feet wide
The economic value of the private lands along the route is associated with 1) agricultural productivity and 2) rural development value: which is closely tied to quiet enjoyment, scenic vistas, wildlife issues and recreational opportunities.
There will be direct, indirect and cumulative impacts of the proposed route on these economic values.
Land Use
Ground is one of the most important resources we have in Southwest Montana. Turning private property into a “Crop of Towers, substations and Access Roads” make for a lousy return on investment to private property owners.
Tax Revenue
Regardless if MSTI is built on Public or Private land ~ Counties will still receive the tax revenue
NWE is simply a “pass through agent” that transfers taxes it collects from ratepayers to state and local governments. So customers will actually be paying these TAXES
Who Benefits? (Pro-project)
Provide a transmission route for wind, coal and natural gas generated energy in Montana to Nevada and California
Additional property tax revenue to the counties (MT and ID) where the line is built
All electrical power will be shipped out of state; this line will not be used to provide power to MT – it is an EXPORT line.
The people of Montana and Idaho will ultimately pay for this through adverse health effects, decreased property values, loss of property use and enjoyment, impacts on ranching & farming operations, spread of noxious weeds.
Consider the REAL costs of the MSTI proposed routes:
- Loss of grazing land and farm ground
- Loss of aesthetic values, scenic vistas, and Open Space
- Loss of property value
- Fire hazards
- Hardship to private landowners who are the stewards of the land
- Stress and worry of associated risks to children, grandchildren and livestock
What can YOU do?
Write to these elected state officials and your local officials to voice your concerns:
Governor Schweitzer Montana Capitol Building PO Box 200801 Helena MT 59620-0801 Senator Baucus Hart Senate Office Building Room 511 Washington, DC 20510 Representative Rehberg 2448 Rayburn House Washington DC 20515 Helena Contact: Maren Olson 443-7878 Senator Tester Senate Russell Building Room 204 Washington DC 20510 Butte contact: Pam Haxby-Cote 723-3277
Let us join together to protect environmental and recreational quality and resources, aesthetic beauty, private property rights, and quality of life for ourselves and every generation.
Under the MONTANA CONSTITUTION:
We all have the right to a Clean, Healthy and Safe environment.
Our goal is to move MSTI and future utilities from private land corridors to public land corridors.

PUBLIC Utilities should be on PUBLIC Land